darrens Key Veteran Location: United Kingdom
My Posts This: Topic Forum | We are making a minor change to tail layout so that the defuser can be removed and the link rod goes back to being central (we don't like the flipped lever arrangement). We have to finish the sliding door mechs, fit the exhaust and a few of the nav lights before fitting the tail. Then just a few minor scale bits before building up and test flying, so it really is quite close. The test flights will include setting up the Helitronix mixer etc, then we strip it and send it for priming. Once primed, it comes back to me for riviting prior to the final paint and laquer. There will no doubt be a few things that add to this list as we go along, so I have to allocate some time to that. This does make the August 2/3 a very tight deadline. If we think we are going to miss it, we may postpone the painting and bring the finished machine (no paint) to show instead.
Cheers
Darren
He who dies with the most toys is the winner! |