tris_heli Key Veteran Location: Lidlington, Bedfordshire, UK
My Posts This: Topic Forum | Hello Sean,
I think you have got excatly the opposite problem that i have - My other half always gives disapproving looks when the next package arrives for the EC135 or when darren turns up at the door!!!.
I must admit that after some playing about, i think the lower runner will be easy(ish) to achieve - Its all about making something that will run smooth and yet is able to cope with the everyday ware and tare.
Current plan is to use some Ali sheet, bent and folded with a cut at one end to allow the track to recess into the fuz. Ive been playing about with some rollers made out of casting epoxy running in 12ba bolts which will then reach below this track and back again, allowing the runners to run on the inside of the Ali. As soon as the door closes, it follows the track into the fuz closing the dooe.
Early days though.. Will post some pic's if i get it working. Unfortunately in the middle of a load of cisco exams at the moment so its taken a back set until next week.
Cheers Tris |