RR Rated M For Mature
HOME   rrTV-PHOTO   GALLERIES   MY GALLERY   HELP-FAQ
myHOME PM pmRR MEMBERS 653 ONLINE 18 EVENTS SEARCH REGISTER  START HERE
 HS10's Photograph Gallery & Reference Info
ViewingPrinting
My New Uploads
DISPLAY ALL  < HS10 >  PM  Email  Posts  View Script  Top13445 views HELP-FAQ
 
 

General Laser Stabilizer Manual Stabilizer_300106_english.pdf  232k

TREX 450 Trainer Project
 
 

A123 Lipo Battery Project
 
 
Cells Salvaged From 36v DeWalt Pack
Cells Aligned
Cells Soldered, TP Tap and Covering Installed
Initial Test






Current Project - Logo 24 converted to 60 size OH-58A
 
 
Scale Subject 1
Scale Subject 2
Scale Subject 3
Scale Subject 4




Scale Subject 5
Scale Subject 6
Century Fusalage
Camo Paint




What is this?
Step Detail
01-10-08 Let The Fun Begin




Bell Specs
Bell Specs




Determine Scale
Landing Skids 1st try
Landing Skid Bow
Landing Skid Interior Frame




Landing Skid Interior Frame
Treating The Seams
1/2 Painted and Fitting Mechs




Scale Nav Light Package




HeliCommand
Flybarless 1
Flybarless 2
Flybarless 3




Helicommand Mount 1
Helicommand Mount 2
Helicommand Mount 3




 
 
Helicommand Mount 4
Helicommand Mount 4
Crash 1
Crash 2




Crash 3
Crash, After Repair
Frame Ground
Boom Ground




HeliCommand Rigid
90% done
90% done
90% done




90% done

OH-58A Project - Flight Testing after Elec Glitch
 
 
OH-58A Project - HeliCommand
 
 
OH-58A Project - Phase Timing
 
 
OH-58A Project - Navigation Lights
 
 
OH-58A Project - Test Flight
 
 
OH-58A Project - Helicommand Position Mode Test
 
 
Logo 24 (Stretch for 700mm w/ Nue 1915/1.5Y) converted to 60 size Semi-Scale Agusta 109A
 
 
Original, Front
Original, Side




Original, Back
Stretched Back View
Stretched Front View
Logo 24 - 14




Neu 1915/1.5Y Mounted w/Spacer
Helper Spring (10 lbs + Total Flight Wgt)
Select Scale - Century Agusta 109A




Start of project - Jan 2007
Determine Mounting Loc
Mounting Platform
Mounted Logo 24 Frame




Flight conditions
1st Spool-up Test - Ground Resonance
Fuselage frame Brace
Fuselage frame Brace




ESC, Rx Battery, Volt Meter
Tail Rotor, Outside
Tail Rotor, Tail Cone
Tail Rotor, Tail Cone




Battery Mount & Wiring Routing
Windshield & Overhead Window Mounting
Battery Arming Method
Upper Fuselage Securement




Upper Fuselage Securement
Upper Fuselage Securement
Upper Fuselage Securement
Foot Window Installed




Rubber Window Molding
Access hole
11/2007 Update



Agusta 109 Scale Details
 
 
North Memorial #1
North Memorial #2
North Memorial #3
North Memorial #4




Paint #1
Paint #2
Paint #3
Cockpit #1




Cockpit #2
Cockpit #3
Tomasallan's Agusta - Looks Great
Tomasallan's Agusta - Looks Great




Tomasallan's Agusta - Looks Great

Current Project #2: Logo 14 (Stretch for 600mm w/ Nue 1912/1.5Y) converted to MH-6 "Little Bird"
 
 
Original L14
Original L14
Original L14
Logo 24-14 Stretched




Century 50 Size
Model Subj #1
Model Subj #2
Model Subj #3




Model Subj #4
Model Subj #5
Model Subj #6
Model Subj #7




Model Subj #8
Model Subj #9
Model Subj #10
Model Subj #11




Model Subj #12 FR
Model Subj #13 FR
Test Fit Pod & Boom
Enlarge opening




Build mount
Build mount
Install pod & boom
Install Gold-N-Rod




Install tail assy
Test & check tail assy
Getting Ready




Getting Ready
Quick battery change
Quick battery change
ESC Arming Method




1st Flight 3/17/07
1st Flight 3/17/07
Seat Pods
Final Paint




 
 
Final Paint
Fast-Rope Fixture
MOD 10S2P 4amp > 10S4P 8amp
MOD 10S2P 4amp > 10S4P 8amp




Battery Mount

Non-Helicopter Related (Pets & Wildlife)
 
 
Tera
Millimeter







Logo 14 (My 1st & Favorite)
 
 





















DRAGANFLYER V Ti
 
 





Helicopter Related Activities & Aviation
 
 







Naval Aviation
 
 
PR
1st Jump (Illistrative Image)
PR A School
PR A School




NALF Imperial Beach
HELANTISUBRON TEN
Sikorsky SH-3
Sikorsky SH-3




Sikorsky SH-3
NAS North Island
HELANTISUBRON TEN




SERE School
























Manuals & Reference
 
 
GL_-_Stabilizer_Reference_Draft-1.doc  5.1mb

Sunday, November 22 - 3:55 am - Copyright © 2000 - 2009 runryder.com | email | link to rr | START HERE | NF